Construction Of The Second Module Of The Lavasan Wastewater Treatment Plant

Project Name: Construction of the second module of Lavasan Wastewater Treatment Plant and upgrading Phase 1, testing, commissioning and operation for12 months

The project includes the construction of 2 secondary sedimentation units, conversion of the aeration unit process to the A2O system, including the construction of Aerobic, Anaerobic, anoxic systems, and the addition of deep mixers and a deep aeration system.

Capacity of 12,000, expandable to 25,000 cubic meters per day, structures including2 secondary sedimentation basins, debris catcher structure, grain catcher and upgrading of aeration structures.

Generator and chlorination building

Equipment including debris catcher, grain catcher, mixers, aeration blowers, diffusers and diesel generator air distribution pipes, chlorination equipment, electrical and control panels and equipment.

  • FIELD : Construction Of The Second Module Of The Lavasan Wastewater Treatment Plant
  • CONTRACT NUMBER :  19110-21465
  • CONTRACT DATE :  05/25/2019
  • CLIENT / CUSTOMER :  Water and Wastewater East of Tehran Province
  • CONSULTANT :  MojAb Consulting Engineers
  • CONTRACTOR :  TAVAAN AZMAYAN TECHNICAL & CONSTRUCTION COMPANY
  • CAPACITY :  25000 cubic meters per day
  • ROJECT STATUS : Opening of the first phase
  • PROJECT INITIAL DURATION :  24 months
  • START DATE :  05/25/2019
  • END DATE : Phase 1 – 07/15/2025 – Phase 2-Underway
  • PROJECT SITE LOCATION : Lavasan City
  • PROJECT SITES NUMBERS : 1Station